How a Lightning Decision Jam helps hotels solve big problems
A Lightning Decision Jam turns a room of opinions into one tested decision in about an hour. Here is how to run one with a hotel team.
The heads of department meeting runs over again. Revenue wants more weekday corporate business, the restaurant wants the terrace marketed and the general manager wants to know why the function rooms sit empty on Tuesdays. Everyone agrees something has to change. Nobody leaves with a task.
Hotels are rarely short of ideas. They are short of a way to turn a room of opinions into one decision that somebody owns and tests.
A Lightning Decision Jam (LDJ) is a structured workshop of about an hour that does exactly that. A small team writes down what is working and what is not, votes on the problem that matters most, rewrites it as a challenge, comes up with solutions in silence, votes again, and leaves with three actions and a date to review the result. There is no presenting, no debating and no waiting for the loudest person to finish.
It is one of the workshops our Umi Labs team reaches for when a problem has been discussed for months without moving. This guide covers what an LDJ is, the problems it suits, how to prepare, every step of the session, and how to get colleagues to agree to try one.
What a Lightning Decision Jam is
The LDJ is a set of short, timed exercises run in a fixed order, with sticky notes, dots and a whiteboard. Each exercise narrows the field, from everything the team thinks about a topic down to one idea worth testing.
Where it comes from
It was developed by AJ&Smart, a Berlin design agency best known for its work on the design sprint. A design sprint takes a team four or five days to go from a big question to a prototype tested with real users. The LDJ keeps the sprint's core habits, silent individual work, voting and strict timeboxes, and fits them into a single session that anyone can run.
Why it beats an ordinary meeting
Most meetings fail in the same few ways. The first idea spoken anchors the rest. The most senior or most confident voice wins. Discussion expands to fill the time, and when the meeting ends the energy goes with it, because nobody was given anything specific to do. The jam designs each of those out.
- Everyone writes before anyone talks. Ideas are captured independently, so the first suggestion does not shape the other twenty.
- Votes replace debate. Dot voting surfaces what the group actually thinks in three minutes, not after forty minutes of argument.
- Seniority carries no extra weight. Solutions go on the board without a name and without a pitch, so the night manager's idea gets the same look as the owner's.
- The quiet people get the same airtime. Someone who would never interrupt a heads of department meeting still puts five notes on the board.
- It ends with actions, not minutes. The last ten minutes exist to turn the winning idea into three steps with owners and a review date.
The whole format is built so that the session cannot end without a decision.
Problems worth jamming on
An LDJ works best on a problem that is real, specific enough to act on, and owned by more than one department. In a hotel, that describes most of the problems that refuse to go away.
- Empty function rooms midweek. Sales, events, marketing and the restaurant all touch it, and nobody owns it outright.
- Too much business through the OTAs. Revenue, marketing and the website team each hold part of the answer. Our guide to boosting direct bookings covers the strategy; a jam is a good way to pick the first move.
- A weak pre-arrival upsell. Reservations, front office, spa and F&B each have something to sell, and the guest hears from none of them.
- Slow responses to enquiries. It is usually a handover problem between sales, reservations and whoever reads the shared inbox.
- A new opening or relaunch. An open-ended jam on "what will go wrong in the first month" surfaces risks while there is still time to fix them.
Notice the pattern. Almost every one of these lives in the joins between teams, where no single head of department has the authority, or the full picture, to fix it alone.
Some things do not suit a jam. A pricing decision that needs data rather than opinion belongs with the revenue team and its reports. A people issue belongs in a private conversation. And a decision that has already been made upstairs should not be dressed up as a group exercise, because the team will notice.
The conversation starts excited, gets complicated quickly, and lands on "let's revisit this next quarter." Next quarter never comes.
Harry Fielder, CEO, Umi
That pattern is exactly what an LDJ is built to break. It does not try to solve everything; it forces the group to pick one thing and start.
Before you start
Preparation takes ten minutes, but it decides whether the hour is useful.
Who is in the room
Four to eight people is the right size. Fewer and you lose the range of views; more and the voting and placing steps start to drag.
Invite across departments rather than up the hierarchy. For a problem like midweek function rooms, that might be the events manager, someone from sales, the restaurant manager, a marketer and a front office supervisor. The general manager can join, as long as they write and vote like everyone else and do not comment on other people's notes.
The moderator
One person runs the session. They can still write and vote, but their real job is to keep time, stop discussion breaking out where it is not allowed, and handle the steps that need a single pair of hands, such as grouping duplicates and writing the challenge statement.
It usually makes sense for whoever called the jam to moderate. If the topic is personal to them, ask someone else, so the room trusts the process.
Agree the topic before the session. A narrow topic ("weekday restaurant covers") gives sharper results than a broad one ("the guest experience"). An open-ended jam, with no set topic, is worth running at a team away day when the aim is to surface problems nobody has named yet.
The kit
- Square sticky notes in two colours. One colour for positives and problems, the other for solutions.
- Rectangle sticky notes. For the challenge statement.
- Sticky dots in two colours. One colour for voting, the other for marking the winners.
- Marker pens. Thick ones, so notes can be read from across the room.
- A visible timer. A phone works; a clock everyone can see works better.
- A whiteboard or flipchart. A blank wall will do.
If the team is spread across properties or working from home, the same session works on a shared virtual board. We cover the set-up, the tools and the remote-specific pitfalls in our guide to running a remote Lightning Decision Jam.
Running the jam step by step
The whole session is eight steps and takes a little under an hour for one problem.
- Start with what is working (10 minutes).
- Write down the problems (5 minutes).
- Vote on the problems (3 minutes).
- Reframe the top problem as a challenge (5 minutes).
- Come up with solutions individually (6 minutes).
- Vote on the solutions (5 minutes).
- Plot the winners on impact and effort (10 minutes).
- Turn the best solution into actions (8 minutes).
Start with what is working
The moderator draws a sailboat on the board, with a sail, an anchor and a waterline. Above the water is what moves the team forward. Below it is what holds the team back.
In silence, everyone spends four minutes writing positives about the topic, one per note. Then each person takes a minute or two to read theirs out and stick them above the waterline. Nobody else comments.
Starting with the positives is deliberate. A team that has just listed what it does well is more open-minded when it gets to solutions, and less defensive when the problems go up.
Write down the problems
Another four minutes of silent writing, this time on anything about the topic that is getting in the way. Again, one problem per note.
When the timer stops, everyone sticks their notes below the waterline at the same time, without reading them out. That matters. Nobody has to say a criticism of a colleague's department aloud, so people write what they actually think.
Vote on the problems
The moderator stacks any obvious duplicates on top of each other so votes are not split. Each person then gets three dots and three minutes to vote for the problems they think matter most. You can vote for your own and put more than one dot on a single problem. Positives get no votes.
The moderator then arranges the voted problems into a rough priority pyramid, most dots at the top. It rarely looks like a pyramid, and it does not need to.
Reframe the problem as a challenge
The moderator takes the top problem and rewrites it as a "How might we" statement on a rectangle note. "Our function rooms are empty midweek" becomes "How might we fill the function rooms on Tuesday and Wednesday?"
The phrasing matters more than it looks. A problem invites people to explain why it happened. A challenge invites them to suggest what to do about it. This is the step that takes the most thought from the moderator, so it is fine to ask the group for a quick steer on the wording.
On a first jam, stick to one problem. You can repeat steps four to eight for the second and third, but each one adds about half an hour.
Come up with solutions individually
Using the other colour of note, everyone writes as many solutions to the challenge as they can in five minutes, without discussion. Quantity is the goal at this point; the voting will sort quality.
Then everyone sticks them on the board. Nobody presents them, so each note has to make sense on its own. This is where the room stops favouring the idea that comes from the boss or the best talker.
Vote on the solutions
The moderator removes duplicates. Everyone gets six dots this time and four minutes to vote for the solutions they think would best answer the challenge, with the same rules as before. The moderator arranges the results into a second priority pyramid.
Plot the winners on impact and effort
Voting tells you what the group likes. It does not tell you what is worth doing first. For that, the moderator draws a simple scale, with impact running up the vertical axis and effort running left to right along the bottom.
Taking the top-voted solution first, the moderator places it in the middle and asks the room one question: higher or lower? The note moves up or down until the group roughly agrees on its impact, then left or right for effort. It does not have to be precise, and the moderator should cut off any debate that starts. Repeat for each solution with more than one vote; note the rest for later.
The four corners then sort themselves. Top left holds the quick wins, high impact for little effort; mark them with the second colour of dot and test these first. Top right is high impact but high effort, worth doing as a planned project rather than a quick test.
The bottom half has less impact. Low-effort ideas in the bottom left can wait until there is time, and the bottom right, a lot of effort for little return, can be noted and left.
A meeting ends with opinions. A jam ends with a test.
Turn the best solution into actions
Take the solution nearest the top left corner and ask the group for three simple steps that would test whether it works. The person who suggested it can go first. The steps only need to be enough to prove or disprove the idea, not a full rollout plan.
Each step gets a named owner. Agree how long the test will run, usually one to two weeks, and before anyone leaves the room, put a calendar invite in for the review.
After the session
A jam that ends without a review date in the diary has not finished. The review is where the idea either earns its place or makes way for the next one.
If the test works, roll it out properly and give it a permanent owner. If it does not, take the next quick win off the board and run the action step again. Either way the team has learnt something real about its guests in a fortnight, which is more than most meeting series manage in a quarter.
Make the test measurable before it starts. "Run a midweek day-delegate offer to the local business list and count enquiries" is a test. "Raise awareness of the function rooms" is not. Where the idea lives on the website, such as a new offer page or a different booking prompt, the same discipline applies as A/B testing on a hotel website: decide the measure first, then change one thing.
The top right corner deserves its own follow-up. Those are the ideas with real impact that need a proper project behind them, such as a new booking flow, an integration between two systems or an automated guest journey. They are often the most valuable thing a jam produces, and they are the kind of work that benefits from a prototype before anyone commits budget.
It is worth watching what keeps landing in that corner. When the same idea needs the PMS, the booking engine and the CRM to talk to each other, the jam has found something bigger than a function room problem: systems and teams that were never set up to work together.
Getting colleagues to say yes
The hardest part of a first LDJ is often getting it in the diary. People have sat through workshops before, and "another meeting" is not an easy sell in a hotel where the team is already stretched.
The way to win the room is to start from their frustration with meetings, and only then mention the method.
- Start with the status quo. Ask colleagues what they dislike about the meetings they already sit in. You will hear the same complaints every time, from the overruns to the lack of any follow-up.
- Show you share it. Agree with them, honestly. Most of those complaints are fair, and saying so earns you the next ten minutes.
- Show how the jam answers it. Walk through how each complaint is designed out, with silent writing for the people who never get a word in and a fixed end time for the overruns.
- Pick a problem they already care about. Choose one the team has been circling for months, so the session is about their problem rather than your process.
- Make the ask small. The worst case is one hour spent on a problem that was not getting solved anyway. The best case is that it finally moves.
Once a team has run one jam and seen a test come back, the second one rarely needs selling. The boss who might have needed persuading has already voted on the solution, so there is nobody left to convince.
Your first jam
Pick the problem that has come up at the last three heads of department meetings without moving. Book an hour next week with five people from different departments, buy the notes and the dots, and appoint a moderator who is not the most senior person in the room.
Then hold the line on the rules for the full hour. No discussion during the silent steps, no presenting the solutions, and nobody leaves without an owner and a review date.
The method is borrowed and the kit costs less than a round of coffees. What it changes is who gets heard and whether anything happens on Monday.
Questions hotels ask
A Lightning Decision Jam is a structured workshop of about an hour, developed by the design agency AJ&Smart, in which a small team identifies problems, votes on the most important one, generates solutions in silence, prioritises them by impact and effort, and leaves with three actions to test the best one.
About an hour for a single problem, including all eight steps. Each additional problem adds roughly half an hour, so on a first jam it is best to tackle just one.
Four to eight people works best. Fewer narrows the range of views, while more slows the voting and placing steps. In a hotel, invite people from different departments who all touch the problem.
Yes. The eight steps stay the same, with a shared virtual board standing in for the whiteboard, sticky notes and dots. It suits groups and owners spread across several properties.
A design sprint runs over several days and ends with a prototype tested on real users. A Lightning Decision Jam borrows the same principles, silent individual work, voting and strict timeboxes, and compresses them into one session that ends with a small test the team runs itself.